PAT Testing
Under Construction.
Information to follow shortly.
Precautions shall be taken to ensure that the periodic inspection and testing shall not cause
danger to persons or livestock and shall not cause damage to property and equipment even if
the circuit is defective. Measuring instruments and monitoring equipment and methods shall be
chosen in accordance with relevant parts of BS EN 61557. If other measuring equipment is used, it shall provide no less degree of performance and safety.
The extent and results of the periodic inspection and testing of an installation, or any part of an installation, shall be recorded.
Periodic inspection and testing shall be undertaken by a competent person.
Frequency of Inspection & Testing
The frequency of periodic inspection and testing of an installation shall be determined having
regards to the type of installation and equipment, its use and operation, the frequency and quality
of maintenance and the external influences to which it is subjected. The results and
recommendations of the previous report, if any, shall be taken into account.
In the case of an installation under an effective management system for preventive maintenance
in normal use, periodic inspection and testing may be replaced by an adequate regime of
continuous monitoring and maintenance of the installation and all its constituent equipment
by skilled persons, competent in such work. Appropriate records shall be kept.
|